Zoo
Location
In the Industrial Park.
Purpose
The Zoo is the veterinary hospital for Meany animals. In the Zoo, the veterinarians administer the TLC needed to keep them going. Since the Zoo is only big enough for one critter at a time, the Machines take turns breaking down. If you believe that one, we’ve got a Tom Cat differential we’d like to sell you.
Events
- Construction: 1993
See Also
- Zoo Building Plans
History
1984
Bulldozed area behind the Cat House to make a larger industrial area, losing Kitchen Jump in the process. nw
1993
Construction of the Zoo was led by Mike Lonergan. The field work was completed in the fall of 1993 with a tracked loader and a backhoe. The building construction started on October 1st and was fully enclosed by the November work party. wp93
Now that I dig through old notes, I believe the floor has welded wire mesh–I have no idea on gauge or spacing. We did not have the money for rebar, we did not have the labor units to tie rebar, and we did not have a good way of transporting long loads. –Mike Lonergan, May 2020
2003
A traditional Meany custom is to endearlingly name our mobile machinery after an appropriate animal. The zoo houses some of our animals and any at one time or another when they need some tending to. The zoo can also be used for sheltered activities such as MOFA and the Mushroom society’s weekend for display tables, etc.75th
2017
Floor is cracking and heaving. See report
2020
Furnace: Propane 125k BTU/hr Storage: (4) 100# tanks